Minipa Link
Back to solutions
Security & CCTV

Every site survey documented before you leave

Photos, checklists and an acceptance report on the same project — cameras, rack and cabling.

01

Visit stages

Pick a stage. The phone follows the visit — from the first photos to the client report.

9:41●●● 5G
CCTV — commercial building
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
Survey
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)
22 Jun 2026
JSFacade
MACameras
LFRack
JSCabling

Stage 1/6 · Project opened · first photos

9:41●●● 5G
CCTV — commercial building
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
Survey
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)
22 Jun 2026
JSFacade
MACameras
LFRack
JSCabling

Stage 1/6 · Project opened · first photos

02

On the phone and on the web

The project on the phone, the client report, and one team panel — activity or the report editor.

9:41●●● 5G
CCTV — commercial building
Norte Engenharia02/08 – 10/08São Paulo, SP
Active
Survey
JSMALF
Checklists6
Tasks8/12
Documents2
Organize4
Media (6)
22 Jun 2026
JS
MA
LF
JS
MA
LF
Project on the phone
9:41●●● 5G
ChecklistCamera positions
4/667%
Stage statusSingle choiceCameras
Not startedIn progressDone
Camera photosSingle choiceMount and coverage
PassFailN/A
Photo22 Jun 2026
Facade photosSingle choiceEntrance and plaza
PassFailN/A
Photo22 Jun 2026
Docs receivedSingle choiceOn the project
ReceivedManual
Open NCsSingle choiceCameras pending
NoneOpen NCs
NotesChecklistStage notes
Checklist
9:41●●● 5G
Acceptance reportCCTV — commercial building
Report 024

Acceptance report

CCTV — commercial building
São Paulo, SP

24 Aug 2026
Norte Engenharia
Assigned · JS, MA, LF

Site conditions

Site 24 °C · CCTV in service

Crew

RoleQtyHours
Technician216 h
Helper18 h

Instruments

MTV-10M3 h
MTC-1833 h
ET-35502 h

Work of the visit

Camera photosDone
Rack and cablingDone
Acceptance checklistIn progress

Findings

Facade photos on the project. Camera positions recorded. Rack and NVR photographed. Cabling on the tray closed. One watch item on a run — schedule a follow-up.

Visit photos

Signatures

Eng. Lucas Ferreira — CREA 508789/SP
Supervisor João Alves
Acceptance report
Team panel: activity and report editor

See it in practice

Start free and hand over every security system with proof.