Minipa Link
PricingResourcesSupport
Log inSign up
Back to solutions
Solar energy

Test and maintenance of solar energy systems

Measure on the plant, record in the app, close the visit with the PV inspection report.

Start free trialSee demo
Array / modules
MI-2100PVPV insulation · 2-wire + alligatorMIS-880Irradiance W/m² · T1/T2MTV-10MThermography · USB-C on the phoneMSP-730MPPT · +/− on the moduleHFV2100PV voltage up to 2000 V DC
DC lines
HFV4100PV clamp · I/V DC · ATL-PVHFV4200High-voltage PV clampMI-2100PVDC cable insulationHFV2100PV voltage · continuity
01

Inspection stages

Pick a stage. The phone follows the visit — from the first photos to the inspection report.

9:41●●● 5G
⋮
Usina FV — comercialⓘ
SolarTech EngenhariaStage 1/602/08 – 20/08Campinas, SP
Active
Usina FV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)+
22 Jun 2026
JSPlant · commercial
MAArray A
LFDC homerun
JSModule close-up

Stage 1/6 · Project opened · first photos

9:41●●● 5G
⋮
Usina FV — comercialⓘ
SolarTech EngenhariaStage 1/602/08 – 20/08Campinas, SP
Active
Usina FV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)+
22 Jun 2026
JSPlant · commercial
MAArray A
LFDC homerun
JSModule close-up

Stage 1/6 · Project opened · first photos

02

On the phone and on the web

The project on the phone, the PV inspection report, and one team panel — activity or the report editor.

9:41●●● 5G
⋮
Usina FV — comercialⓘ
SolarTech Engenharia02/08 – 10/08Campinas, SP
Active
Usina FV
JSMALF
Checklists6
Tasks8/12
Documents2
Organize4
Media (6)+
22 Jun 2026
JS
MA
LF
JS
MA
LF
Project on the phone
9:41●●● 5G
ChecklistArray inspection
4/667%
Stage statusSingle choiceStrings released
Not startedIn progressDone
Progress photosSingle choiceArray and connections
PassFailN/A
Photo22 Jun 2026
Insulation readingSingle choiceCritical strings
>1 GΩ100 MΩ–1 GΩ<100 MΩ
Photo22 Jun 2026
>4200 MΩ
Measurement22 Jun 2026
Module photosSingle choiceVoc / Isc evidence
PassFailN/A
Photo22 Jun 2026
Open NCsSingle choiceArray pending
NoneOpen NCs
NotesChecklistStage notes
Checklist
9:41●●● 5G
Inspection reportUsina FV — comercial
Laudo 012

PV inspection report

Usina FV — comercial
Campinas, SP

24 Aug 2026
SolarTech Engenharia
Assigned · JS, MA, LF

Site conditions

Clear, 28 °C · irradiance 1.180 W/m²

Crew

RoleQtyHours
Technician216 h
Electrician18 h

Instruments

MI-2100PV4 h
MTV-10M3 h
HDW40963 h

Tests of the visit

Visual inspection (modules / MC4)Done
Array thermographyDone
Voc / Isc and insulation CCIn progress

Findings

Localized hotspot on string 12 (max 72.1 °C). Voc and Isc within datasheet on sampled strings. Insulation CC >1 GΩ. PE continuity OK. DPS CC/CA in place. Inverter: no alarms, 227 V AC, THD 3.1% at 1.180 W/m².

Inspection photos

Signatures

Eng. Lucas Ferreira — CREA 508789/SP
Supervisor João Alves
PV inspection report
Team panel: activity and report editor

See it in practice

Start free and document your next solar commissioning end to end.

Start free trialSee demo
Minipa Link

Smart inspections, instant reports.

Capture photos, pull live measurements from your Minipa device, and turn every job into a report — solo or with your whole crew.

Download on theApp StoreGET IT ONGoogle Play
admin@elecore.com.br

Product

  • Download the app
  • Pricing
  • Create account
  • Log in

Features

  • Photos & video
  • Annotations
  • Bluetooth connection
  • Measurements
  • Checklist
  • Projects
  • Talk with your project
  • Work orders
  • Assets
  • Map
  • Team management
  • Report editor
  • AI reports
  • Quotes

Who we serve

  • Electrical installations
  • Substations
  • Solar energy
  • Electric vehicles
  • Logistics & transport
  • HVAC & refrigeration
  • Telecom & fiber
  • Construction & infrastructure
  • Security & CCTV

Resources

  • Help & support
  • Resources
  • See demo

© 2026 Minipa. All rights reserved.

TermsPrivacy