Minipa Link
PricingResourcesSupport
Log inSign up
Back to solutions
Electrical installations

Every inspection documented before you leave

Photos, Bluetooth readings and a client report on the same project — panels, circuits and grounding.

Start free trialSee demo
Panels
MI-2705Bus insulationMTV-10MTerminal thermography
Circuits
ET-4095Circuit current / PFMI-2705Insulation
01

Visit stages

Pick a stage. The phone follows the visit — from the first photos to the inspection report.

9:41●●● 5G
⋮
LV electrical — commercial plantⓘ
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
LV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)+
22 Jun 2026
JSPanels
MACircuits
LFLoads
JSGrounding

Stage 1/6 · Project opened · first photos

9:41●●● 5G
⋮
LV electrical — commercial plantⓘ
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
LV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)+
22 Jun 2026
JSPanels
MACircuits
LFLoads
JSGrounding

Stage 1/6 · Project opened · first photos

02

On the phone and on the web

The project on the phone, the inspection report, and one team panel — activity or the report editor.

9:41●●● 5G
⋮
LV electrical — commercial plantⓘ
Norte Engenharia02/08 – 10/08São Paulo, SP
Active
LV
JSMALF
Checklists6
Tasks8/12
Documents2
Organize4
Media (6)+
22 Jun 2026
JS
MA
LF
JS
MA
LF
Project on the phone
9:41●●● 5G
ChecklistPanel round
4/667%
Stage statusSingle choicePanels
Not startedIn progressDone
Progress photosSingle choicePanels
PassFailN/A
Photo22 Jun 2026
InsulationSingle choiceMI-2705
>1 GΩ100 MΩ–1 GΩ<100 MΩ
Photo22 Jun 2026
>100 MΩ
Measurement22 Jun 2026
ThermographySingle choiceMTV-10M
No hotspotsLocal hotspotCritical
Photo22 Jun 2026
Max 41,8 °C
Measurement22 Jun 2026
Open NCsSingle choicePanel pending
NoneOpen NCs
NotesChecklistStage notes
Checklist
9:41●●● 5G
Inspection reportLV electrical — commercial plant
Report 024

Inspection report

LV electrical — commercial plant
São Paulo, SP

24 Aug 2026
Norte Engenharia
Assigned · JS, MA, LF

Site conditions

Indoor 24 °C · plant in service

Crew

RoleQtyHours
Technician216 h
Helper18 h

Instruments

MI-27054 h
ET-40953 h
MTR-21002 h

Tests of the visit

Panel / circuit roundDone
Earth electrodeDone
Load board follow-upIn progress

Findings

Panel insulation >100 MΩ. Bus thermography with no critical hotspots (max 41.8 °C). Circuit current 18.4 A. Earth electrode 2.6 Ω. One watch item on a load board — schedule a follow-up.

Visit photos

Signatures

Eng. Lucas Ferreira — CREA 508789/SP
Supervisor João Alves
Inspection report
Team panel: activity and report editor

See it in practice

Start free and document your next electrical visit in one place.

Start free trialSee demo
Minipa Link

Smart inspections, instant reports.

Capture photos, pull live measurements from your Minipa device, and turn every job into a report — solo or with your whole crew.

Download on theApp StoreGET IT ONGoogle Play
admin@elecore.com.br

Product

  • Download the app
  • Pricing
  • Create account
  • Log in

Features

  • Photos & video
  • Annotations
  • Bluetooth connection
  • Measurements
  • Checklist
  • Projects
  • Talk with your project
  • Work orders
  • Assets
  • Map
  • Team management
  • Report editor
  • AI reports
  • Quotes

Who we serve

  • Electrical installations
  • Substations
  • Solar energy
  • Electric vehicles
  • Logistics & transport
  • HVAC & refrigeration
  • Telecom & fiber
  • Construction & infrastructure
  • Security & CCTV

Resources

  • Help & support
  • Resources
  • See demo

© 2026 Minipa. All rights reserved.

TermsPrivacy